I have finished Add 1, at least to the point where I can use it in the final product. All I need to do now is start and finish the second add and put everything together into one video. I'm not worried about the video editing because in my last projects class I was able to do all my post work in a day or two. I'm really cutting down on the quality of the drawing but I don't care that much because, now more then ever, all I care about is the animation. However, I don't want a forth of the video to just look bad. If I can't get the second add finished soon then I may just cut it from the video in favor of polishing what I already have.
This is a shot from the second add.
Wednesday, March 8, 2017
Wednesday, March 1, 2017
Record of Process 7
I have essentially finished half of the animation part of the project. The first and second parts with the Host are ready to use, but there are still some things that I will try to fix or add if I have the time. I started the first add today, the one that is trying to sell rulers, and I used Photoshop to draw all the rulers I needed. This took a bit longer than I planned but I'm not worried because I see myself having Add 1 finished by the end of Monday or sooner.
Subscribe to:
Posts (Atom)